Message: this is our testing site. If you break it let us know (but don't break the live site)
Learn more nowMessage: this is our testing site. If you break it let us know (but don't break the live site)
We work with the community to ensure the sustainable use of our natural resources. One such way is by ensuring the safe and sustainable extraction of alluvium.
Alluvium does not exclusively refer to gravel. Alluvium is defined in the Regional Plan: Water for Otago (RPW) as “Sediment including rock, gravel, sand or silt material deposited by flowing water on floodplains and in lake and riverbeds, as a result of alluvial processes.”
Any extraction of alluvium/gravel from a river bed must comply with the rules in the RPW. Rule 13.5.1.6 of the RPW outlines the permitted activity criteria for the extraction of alluvium within the bed of the river. The rule states that:
You can find more information on this rule in the "Land Use on Lake or Riverbeds or Regionally Significant Wetlands" section. Where the above criteria cannot be met, resource consent will be required for taking gravel.
May 2014
PDF | 471 KB
Application forms for a gravel extraction consent can be found on our Ready to apply for consent page. Information on fees and charges can also be found under the apply for consent page.
The processing a resource consent application will incur fees and charges. The costs will vary depending on the time involved, the quality of information provided, any technical issues and complexity of the application.
Find all the forms you need to apply for a consent, work with compliance, or work through our policy sheets.
It is recommended before applying that you have a pre-application meeting with one of our Consent Planners. This can be done by completing the "Request for pre-application advice" form.
The first 30 minutes of staff time can be offered free of charge, however, any time spent after the first half an hour will incur a charge.
A consent application made to extract gravel requires an assessment of environmental effects. This assessment must include, but are not necessarily limited to, effects on:
Schedule 1 of the RPW contains many scheduled values for watercourses in Otago. This can be found in the Schedule of natural and human use values of Otago’s surface water bodies.
The extraction of gravel may incur royalties. Royalties are set to ensure the Crown receives a fair financial return for the development of its minerals to the benefit of New Zealand. These are paid at a rate of $0.11 per tonne sold. More information on gravel royalties can be found on the NZPAM.govt.nz Minerals permits page.
If you have any more questions, please get in contact with us at consent.enquiries@orc.govt.nz.